Solar Power Integration on the Seychelles Islands
The Seychelles aim to cover 5% of electricity with renewables by 2020 and 15% by 2030. The local power system operator commissioned a Grid Absorption Study to determine the technical limits for reaching these targets. The study focussed on how much photovoltaic (PV) generation the grid can absorb. A...
Zapisane w:
| Wydane w: | URI:https://journals.openedition.org/factsreports, |
|---|---|
| Główni autorzy: | , , |
| Format: | Article ou chapitre numérique |
| Język: | Anglais |
| Wydane: |
Field Actions Science Reports
2016
|
| Hasła przedmiotowe: | |
| Dostęp online: | Accès Université d'Orléans et IFPM |
| Streszczenie: | The Seychelles aim to cover 5% of electricity with renewables by 2020 and 15% by 2030. The local power system operator commissioned a Grid Absorption Study to determine the technical limits for reaching these targets. The study focussed on how much photovoltaic (PV) generation the grid can absorb. As result, the primary bottleneck was found to be the maintenance of backup generation reserves to compensate for fast down-ramping of PV generation. |
|---|